Live Virtual Apprentice Instruction Program
Schedule Level 2

VIP Live Training Schedule
Level 2

These dates are subject to change. Any changes will be communicated before the start date.

LessonRelated
Module#
SubjectsPerformance TasksTime
(min)
118201
Hangers, Supports, and Restraints:
• Pipe hanger assemblies
Hangers, Supports, and Restraints:
• Install a hanger on a wood joist
• Install a post-installed anchor
• Cut a hanger rod to a specified length
120
218201Hangers, Supports, and Restraints:
• Seismic bracing
• Firestopping assemblies
Hangers, Supports, and Restraints:
• Make up and install seismic brace.
120
318202General Purpose Valves
• Indicating control valves
• Trim valves
General Purpose Valves
• Install a gate valve.
• Install a supervisory (tamper) switch.
• Install a butterfly valve
120
418202General Purpose Valves
• Supply system valves
• Pressure control and air venting valves
General Purpose Valves
No tasks for this section.
120
518203Math for Sprinkler Fitters
• Use basic math operations to solve problems.
• Demonstrate practical calculation related to sprinkler systems.
Math for Sprinkler Fitters
No tasks for this section.
120
618203Math for Sprinkler Fitters
• Practice using math.
Math for Sprinkler Fitters
No tasks for this section.
120
Supervisor Performance Task Log Due - Lessons 1-6
718204Shop Drawings
• Drawings used in sprinkler system installation.

Shop Drawings
No tasks for this section
120
818204Shop Drawings
• Common symbols used in sprinkler system shop drawings
• Building Information Modeling (BIM)
Shop Drawings
• Use an instructor-supplied shop drawing to identify various types of information, including the sprinkler legend, title block, north arrow, sprinkler type and temperature, and pipe size.
120
918204Shop Drawings
• Practice /recap/creative development
Shop Drawings
No tasks for this section.
120
1018205Standard Spray Sprinklers
• Standard spray sprinkler characteristics
• Types of occupancies
• Types of construction
Standard Spray Sprinklers
No tasks for this section.
120
1118205Standard Spray Sprinklers
• Sprinkler spacing requirements
Standard Spray Sprinklers
• Given an instructor-supplied obstruction scenario, space a standard coverage spray sprinkler to avoid obstruction.
• Determine the maximum sprinkler spacing based on different types of construction.
120
Supervisor Performance Task Log Due - Lessons 7-11
1218206
Wet Pipe Sprinkler Systems
• Wet pipe sprinkler system control valves
Wet Pipe Sprinkler Systems
No tasks for this section.
120
1318206Wet Pipe Sprinkler Systems
• Types of switches
Wet Pipe Sprinkler Systems
No tasks for this section.
120
1418206Wet Pipe Sprinkler Systems
• Hydrostatic testing and system troubleshooting
Wet Pipe Sprinkler Systems
No tasks for this section.
120
1518206Wet Pipe Sprinkler Systems
• Summary/comprehension of wet systems.
Wet Pipe Sprinkler Systems
No tasks for this section.
120
1618207Dry Pipe Sprinkler Systems
• Dry pipe sprinkler system valves

Dry Pipe Sprinkler Systems
No tasks for this section.
120
1718207Dry Pipe Sprinkler Systems
• Pitching piping and installing drains
• Air sources and air maintenance devices
Dry Pipe Sprinkler Systems
No tasks for this section.
120
1818207Dry Pipe Sprinkler Systems
• Testing and troubleshooting dry pipe sprinkler systems

Dry Pipe Sprinkler Systems
• Complete a Contractor’s Material and Test certificate for Aboveground Piping for a dry pipe sprinkler system.
120
1918207Dry Pipe Sprinkler Systems
• Summary/comprehension of dry systems

Dry Pipe Sprinkler Systems
No tasks for this section.
120
20ALLCourse Review
• Test the knowledge gained throughout this course.
Course Review
No tasks for this section.
120
Supervisor Performance Task Log Due - Lessons 12-20